Post by account_disabled on Jan 9, 2024 7:29:02 GMT
Mr. Yongyut said that the AEDP2018 plan will have higher targets from the AEDP2015 plan, for example:• Solar power according to the original plan as of 2036 will install a total of 6,000 megawatts. At the end of 2017, 2,849 megawatts have been operated, but in The new plan is to install another 12,725 megawatts between 2018 and 2037 (rooftop solar and floating solar), with a total target of 15,574 megawatts by the end of 2037.
Biomass energy The original plan Phone Number List was for 5,570 MW at the end of 2017. 2,290 MW has been implemented, with plans to install between 2018 and 2037. Another 3,496 MW is targeted for a total at the end of 2037 of 5,786 MW.Wind power, the original plan was 3,002 megawatts at the end of 2017 already in operation 1,504 megawatts There are plans to install another 1,485 megawatts between 2018 and 2037, with a target total of 2,989 megawatts at the end of 2037.The original plan for electricity from municipal waste was 500 megawatts at the end of 2017. 500 megawatts has been operated.
There are plans to install another 400 megawatts between 2018 and 2037. The total target at the end of 2037 is 900 megawatts.Mr. Yongyut also said that in the AEDP2018 plan there will be no production of electricity from small hydropower and EGAT's large hydroelectric power This is because there is no more operational space, including the lack of electricity production from biogas (energy plants) that the original plan included in the amount of 680 megawatts because there are still technical problems in producing electricity.
Biomass energy The original plan Phone Number List was for 5,570 MW at the end of 2017. 2,290 MW has been implemented, with plans to install between 2018 and 2037. Another 3,496 MW is targeted for a total at the end of 2037 of 5,786 MW.Wind power, the original plan was 3,002 megawatts at the end of 2017 already in operation 1,504 megawatts There are plans to install another 1,485 megawatts between 2018 and 2037, with a target total of 2,989 megawatts at the end of 2037.The original plan for electricity from municipal waste was 500 megawatts at the end of 2017. 500 megawatts has been operated.
There are plans to install another 400 megawatts between 2018 and 2037. The total target at the end of 2037 is 900 megawatts.Mr. Yongyut also said that in the AEDP2018 plan there will be no production of electricity from small hydropower and EGAT's large hydroelectric power This is because there is no more operational space, including the lack of electricity production from biogas (energy plants) that the original plan included in the amount of 680 megawatts because there are still technical problems in producing electricity.